Spacious Log Cabin, Views, Hot Tub, Pool Table

Cripple Creek, CO, United States

6 guests
3 bedrooms
3 bathrooms

🏔 Breathtaking Views of Pikes Peak, Mt. Pisgah & the Sangre de Cristo Range 🎱Basement bar + pool table ❤️️ HOA Private Clubhouse access to playground, pickleball/tennis, disk golf, basketball, and walking trail 🍳 Well-Stocked Kitchen 📍 15 min to Cripple Creek | 1 hr to Colorado Springs | 2 hrs to DIA & Breckenridge ⸻ ✨ Dates not available? Try our other cabin on the same cul-de-sac: airbnb.com/h/mountaintopcabincc ⸻

Good to know

Get ready for the ultimate mountain getaway at Aspen View Log Cabin! This stunning 3-bedroom, 3-bath retreat blends rustic charm with modern comfort—offering plenty of space to relax, entertain, and explore. Soak in breathtaking views of Pikes Peak, Mt. Pisgah, and the Sangre de Cristo Range while enjoying cozy amenities like a well-stocked kitchen, basement bar, and pool table. With access to a private HOA clubhouse featuring pickleball, tennis, disc golf, and more—and just 15 minutes from Cripple Creek—it’s the perfect base for both adventure and relaxation. ⸻ ★ ADDITIONAL PROPERTY HIGHLIGHTS ★ • Enjoy added privacy—each floor features its own bedroom and bathroom for a comfortable, self-contained experience. • TVs in all bedrooms and both living spaces—everyone gets their own screen! • Huge wraparound porch ⸻ ★ IDEAL FOR ★ • Perfect for couples traveling together who want their own space. • Families looking to unwind, reconnect, and enjoy nature together • Friends or small groups who appreciate having separate floors for added comfort and privacy • Remote workers or creatives craving a peaceful, inspiring environment to focus or recharge ⸻ ★ SLEEPING SPACES ★ Upstairs Master Bedroom 🛌 • King-sized bed • Large windows with views & a small private deck • Spacious walk-in closet with private en suite bathroom • Ceiling fan • Smart TV • Blinds for Privacy Main Floor Bedroom 🛌 • Queen-sized Bed • Closet with hangers • Bathroom located just across the hall • Smart TV • Blinds for Privacy Downstairs Bedroom 🛌 • Queen-sized Bed • Closet with hangers • Bathroom located just across the hall • Smart TV • Blinds for Privacy ⸻ ★ BATHROOMS ★ • Fluffy Towels, Washcloths, Make-up Towels, and Hand Towels provided • Hair Dryer in Each Bathroom • Shampoo, Conditioner, Body Wash, TP, and Hand Soap Provided Master Bathroom 🚿 • Stand-up Shower • Whirlpool Jetted Tub • Double Vanity • Large Showerhead • Oversized Mirror Main Floor Bathroom 🚿 • Shower/Tub Combo • Detachable Shower Head • Single Vanity • Oversized Mirror Downstairs Bathroom 🚿 • Shower/Tub Combo • Single Vanity • Oversized Mirror ⸻ KITCHEN 🍳 • Well-Equipped Open-Concept Kitchen • Traditional Drip, French Press & Pour-Over Coffee Maker • Tea and Hot Cocoa Provided • Ground Coffee, Creamer, and Sweetener • Cookware, Including Pots, Pans, Baking Dishes, And Crock-Pot • Storage Containers/Bags, Mixing Bowls, Dish Towels, And Knives • Full-Sized Refrigerator with Built-In Water Filter and Ice Maker • Essential Spices And Cooking Staples • Microwave • Assorted Glassware • Electric Glass Top Stove • Dishwasher ⸻ DINING 🍴 • Dining table that seats 6 • Kitchen Island seating for 4 ⸻ HOT TUB 🌊 • Stand-alone hot tub (seating for 6) • Included with the booking ⸻ DOWNSTAIRS (BASEMENT) 🎯 • Walk-Out Access to the outdoors • Pool Table • Cozy Couch + TV • Bar area with 4 bar stools and mini fridge • Retro Arcade Game "Pac-man" ⸻ OUTDOOR 🌲 • Gas Fire Pit with Comfy Outdoor Couch Seating – Propane provided • Small Fenced Back Yard • Propane Grill & Utensils (Propane Provided) • Large Front & Back Porch with Views ⸻ ENTERTAINMENT + WORK 🌟 • Smart TV in every bedroom, plus both living areas • Log in to any app of your choice with your own login (there is no live tv at this time) • High-speed WIFI • Laptop-friendly desk with natural light and views • Gas fireplace in the living room and in the basement • Board games and puzzles • Record player - vinyl records provided • Guitar • Cozy Floor Book-Nook • Portable Bluetooth speaker ⸻ LAUNDRY 👕 • Washer and dryer in the home • Laundry detergent, stain treatment, and dryer sheets provided • Iron provided ⸻ SAFETY 🛡️ • Smoke alarms • Carbon monoxide detectors • Fire extinguishers • First aid kit ⸻ ★ WHAT’S NEARBY ★ Outdoor + Recreation 🏞️ • Neighborhood Rec Center (10 min) – Basketball, tennis, frisbee golf course (All available to guests except the indoor pool) • Hiking (20–40 min) – Explore Florissant Fossil Beds, Mueller State Park, and Pancake Rocks • Sledding & Ski Resorts (Under 2 hrs) – Monarch, Cooper, Breckenridge, Keystone, Vail, and Frisco Adventure Park Local Attractions 📍 • Cripple Creek Casinos (15 min) – Enjoy gaming in a historic setting • Mollie Kathleen Gold Mine (20 min) – Descend 1,000 feet into an authentic gold mine • Cripple Creek & Victor Gold Mine (25 min) – A look into Colorado’s mining history • Ice Castles (16 min) – Typically open from January to March. Castle Ice Formations. • Rita the Rock Planter (23 min) – A giant wooden troll crafted from recycled materials • Colorado Wolf & Wildlife Center (30 min) – See and learn about wolves • Pikes Peak (50 min) – Iconic 14er reachable by car, hike, or cog railway. • Dinosaur Resource Center (45 min) – Fossils and prehistoric exhibits • Manitou Cliff Dwellings (1 hr) - Walk through reconstructed Ancestral Puebloan dwellings and explore museum exhibits • Cave of the Winds (1 hr) - Tour illuminated caverns or explore by lantern. Thrill-seekers can try zip lines, obstacle courses, and the Terror-Dactyl ride. • Sun Water Spa (1 hr) - Relax in cedar soaking tubs filled with mineral-rich water, enjoy massage and skincare treatments, or join a yoga class in their open-air studio. Fishing 🎣 • Dream Stream (30 min) – Prime trout fishing in Lake George • Eleven Mile Canyon (35 min) – Scenic waters for anglers • Eleven Mile Reservoir (1 hr) – Large fishing area with diverse catches • South Platte River – Deckers (1 hr 15 min) – Classic Colorado fly fishing Groceries 🛒 • Woodland Park (38-43 min): Walmart, Safeway, City Market, and Natural Grocers • Divide (31 min): The Market at Divide (small market) • Cripple Creek (13 min): Cripple Creek Venture Foods (small market) Hospitals 🩺 • Hospitals – Pikes Peak Regional in Woodland Park (40 min) • UC Health in Colorado Springs (1 hr+) • Urgent Care Options in Colorado Springs (1 hr+) Airports ✈️ • Airports – Colorado Springs Airport (1 hr 20 min) • Denver International Airport (2 hrs 15 min) Colleges 🎓 • Charis Bible College (45 min) • UCCS (1 hr 15 min) • Air Force Academy (1 hr 25 min) ⸻

Other Details to Note

– ESSENTIAL/CAUTIONARY STAY INFORMATION (PLEASE READ) – ⚠️ Driveway Camera: For your peace of mind, we have one outdoor camera located at the end of the driveway, facing the cul-de-sac. It helps us keep an eye on snow conditions and trash pickup—nothing else is monitored, and your privacy is fully respected during your stay. ⚠️ No Holiday Check-ins or Check-outs – Arrivals and departures are not permitted on holidays. ⚠️ No Open Fires – Due to extreme wildfire risk, all fire activity is strictly prohibited and will result in immediate removal. ⚠️ No Air Conditioning – A/C is uncommon in this area, even in new builds. To stay cool, open windows at night and close them during the day. Fans are provided for airflow. ⚠️ High Elevation (9,200 ft) – Altitude sickness is possible. Upon arrival, rest, stay hydrated, and limit alcohol consumption to prevent symptoms. ⚠️ No Third-Party Bookings—Bookings must be made by the guest staying at the property. For safety and security reasons, reservations on behalf of friends, family, or co-workers are not allowed. ⚠️ Rental Agreement - For a smooth stay, we kindly ask guests to sign a short rental agreement before check-in. It's quick and helps ensure everything's clear for both sides.

What this place offers

Entertainment

  • Arcade machine
  • Books
  • Pool table
  • Record player

Kitchen and dining

  • Baking sheet
  • Barbecue utensils
  • Blender
  • Coffee
  • Coffee maker
  • Dining table
  • Dishwasher
  • Freezer
  • Hot water kettle
  • Microwave
  • Mini Fridge
  • Oven
  • Refrigerator
  • Stove
  • Toaster
  • Wine glasses

Bathroom

  • Bathtub
  • Body soap
  • Conditioner
  • Hot Water
  • Shampoo
  • Shower gel

What this place offers

Entertainment

  • Arcade machine
  • Books
  • Pool table
  • Record player

Kitchen and dining

  • Baking sheet
  • Barbecue utensils
  • Blender
  • Coffee
  • Coffee maker
  • Dining table
  • Dishwasher
  • Freezer
  • Hot water kettle
  • Microwave
  • Mini Fridge
  • Oven
  • Refrigerator
  • Stove
  • Toaster
  • Wine glasses

Bathroom

  • Bathtub
  • Body soap
  • Conditioner
  • Hot Water
  • Shampoo
  • Shower gel

Outdoors

  • BBQ
  • Fire pit
  • Garden or backyard
  • Outdoor seating
  • Patio

Bedroom and laundry

  • Bed linens
  • Extra pillows and blankets
  • Hangers
  • Iron
  • Room-darkening shades
  • Clothing storage

Family

  • Board games
  • Children's tableware
  • High chair
  • Travel crib

Home safety

  • Carbon monoxide detector
  • Fire extinguisher
  • First aid kit
  • Smoke detector

Heating and cooling

  • Ceiling fan
  • Indoor fireplace

Common

  • Cleaning products
  • Cooking basics Pots and pans, oil, salt and pepper
  • Dishes and silverware
  • Dryer In the building, free or for a fee
  • Essentials Towels, bed sheets, soap, toilet paper, and pillows
  • Hair dryer
  • Heating Central heating or a heater in the listing
  • Hot tub
  • Kitchen Space where guests can cook their own meals
  • Dedicated workspace
  • TV
  • Washing Machine
  • Wifi

Parking and facilities

  • Free parking on premises
  • Private living room

Location features

  • Private entrance Separate street or building entrance

Accessibility and Availability

Neighborhood

🌲 Cripple Creek Mountain Estates is a private HOA community. The neighborhood is managed by the Cripple Creek Mountain Estates Property Owners Association, which oversees amenities such as a clubhouse, indoor pool, fitness center, and playground. 🚗 Roads are a mix of paved and gravel, and the area is accessible year-round via Teller County Road 1. Located approximately 20 minutes from downtown Cripple Creek, the community offers the perfect balance of seclusion and convenience — with quiet, rural surroundings and easy access to restaurants, casinos, and local attractions.

Guest Access

★ PARKING ★ • Driveway fits 3 vehicles ⸻ ★ GUEST ACCESS ★ • Full home access for all guests (except garage). Any owner areas will be locked or labeled accordingly. • Guests will receive a unique keycode and directions 4 days prior to arrival. This keycode is changed after every guest for your safety. ⸻ ★ TRANSPORTATION (PLEASE READ) ★ • Car Rental Recommended – If you are not driving here, we suggest renting a car • Road Conditions – AWD or 4WD is *required* from November to April. However, please note that snow is still very possible in October and May. Roads are plowed after 6+ inches of snowfall. Summer roads remain accessible but can be bumpy • Best Route – The host provides the best directions to the house, ensuring only 7 minutes on unpaved roads, limited to the entrance of the neighborhood. All other roads leading to this point are paved.

Find us

Cripple Creek, CO, United States

The property is located 7 minutes off of Teller County 1 via a dirt road (Gold King Rd). The driveway does not have a grade but 4-wheel drive/AWD is needed for winter months. Parking is located in front of the house on the driveway. Cripple Creek - 20 min Colorado Springs - 1 hr Florissant - 20 min Woodland Park - 40 min

Sorry we're unable to show you the location for this property

Approximate location. Full address will be provided on booking.